Andrew operation and maintenance Specifications Page 32

  • Download
  • Add to my manuals
  • Print
  • Page
    / 42
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 31
32
Installation Procedures
Step 6
Step 7
Step 8
Recheck subreflector centering and height settings.
Remove and store 206278 lifting tabs. Replace panel seam hardware at lifting tab loca-
tions.
Final Subreflector Settings should be performed with antenna either in operating posi-
tion or a nominal 30° elevation angle.
After you have completed the assembly of your antenna, you are now ready to become
operational. In order to operate the earth station antenna, you will need to direct it to the
desired satellite adjusting both the elevation and azimuth angles appropriately. The fol-
lowing procedures provide details on how to correctly position your antenna on the
desired satellite.
Subreflector Centering
Adjustment Hardware
(3 Places)
Reference Drawing 240272
Figure 22
Threaded Rod
Adjustment Location
(3 Places)
Page view 31
1 2 ... 27 28 29 30 31 32 33 34 35 36 37 ... 41 42

Comments to this Manuals

No comments