Chapter 2 - Installation
42S315F 2-32
2.4.8.3 Grouting Procedures
Perform the following procedures to grout the four base plates to the
foundation:
1. Wash work surface with water. Keep surface saturated with water for
at least 24 hours prior to grouting.
NOTE
Grouting must be completed within 10 minutes after
mixing.
2. Pour grout into a five gallon bucket or equivalent mixing container
and slowly add water. Stir the mix and add grout or water as required
to obtain a good paste.
NOTE
Be sure to mix enough grout to complete each pad at one
time. Once the grout begins to set, new grout will not bond
to the old grout.
3. Starting on one side of each base plate, use a small strip of wood to
work the grout between base plate and foundation. It is important
that the grout be worked from one side to the other to prevent air
from being trapped under each plate. Once the area under the plate is
full of grout, smooth the edges around each plate for best appearance.
4. Immediately after the grout is installed, cover all exposed grout with
clean wet rags (do not use burlap). Keep the rags moist for at least
two hours.
5. After the grout has cured for a minimum of six hours, turn the
leveling screws counterclockwise two to three turns to raise the screw
off the bearing surface. Tighten all anchor bolt nuts as follows:
Model 8009A mount (1.0-inch diameter anchor bolts) to 240 to
275 ft-lb (325 to 372 Nm).
Model 8009AE mount (1.25-inch diameter anchor bolts) to 360
to 440 ft-lb (488 to 596 Nm).
Page view 43