Andrew operation and maintenance Specifications Page 20

  • Download
  • Add to my manuals
  • Print
  • Page
    / 70
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 19
Chapter 2 - Installation
42S315F 2-8
NOTE
The required torque value for the foundation anchor bolts may
not be accurately achieved by the turn-of-the-nut method. For
these bolts, an accurate torque value of 400 to 450 lb-ft (542 to
610 Nm) is required.
2.4.4 Recommended Sequence of Assembly
In order to ensure proper and trouble-free installation, the following
installation sequence is recommended. The sequence is designed to minimize
crane usage time. The crane is only required for items 3, 5, and 6.
1. Site Preparation
2. Assembly of Reflector, Spars and Subreflector
3. Assembly of Mount and Actuators
4. Grouting Base Plate to Foundation
5. Reflector Installation
6. Feed and Waveguide Installation
7. Electrical Installation
8. Limit Switch Adjustment Procedure.
2.4.5 Preparation for Assembly
Before beginning the assembly read and understand the following
instructions.
ViaSat guarantees the antenna specifications, provided that the reflector
assembly procedure is performed by an installation crew trained and
approved by ViaSat, Inc.
Carefully study the assembly drawings to understand how the complete
reflector is assembled. The assembly drawings included in this manual are
examples of typical reflector assemblies with motorized polarization drives
without a de-ice system.
Clockwise and counterclockwise are as observed by a person looking down
onto the front of the reflector while the hub is positioned with its rear side
towards the ground.
Before starting the assembly, verify the following:
Page view 19
1 2 ... 15 16 17 18 19 20 21 22 23 24 25 ... 69 70

Comments to this Manuals

No comments